
ProjectThe Theater at Timber Creek High SchoolLocationFort Worth, TexasInstallerProFormance SystemsSubmitted ByBlaze Audio
The Theater at Timber Creek High School, a prominent academic performance arts venue in the Dallas/Fort Worth metropolitan area, hosts a diverse range of productions, including musicals, theatrical performances, acoustic events, and rental projects. With a seating capacity of 795, the venue required a comprehensive upgrade of its sound reinforcement system due to declining acoustic performance and obstructed sightlines.
The Challenge
Keller Independent School District partnered with ProFormance Systems (PFS) to address these challenges. The primary objective was to enhance audible performance while maintaining clear sightlines for both guests and performers.
The Solution
Blaze Audio was selected as the exclusive power and loudspeaker manufacturer to create a comprehensive audio experience. PFS President Cameron Hefty emphasized the need for a system that was both simple and powerful, providing a seamless experience for the audience. By leveraging Blaze Audio’s technology, PFS achieved a solution that utilized fewer loudspeakers and amplifiers, eliminated delays, and ensured unobstructed sightlines.
System Components
The upgraded system includes:
Outcome
The Theater at Timber Creek High School was delighted with the system’s performance, which provided a full-circle experience enhancement despite its visually compact design. The versatility of the system allows for a wide range of use cases, making it an ideal solution for the venue’s diverse programming needs.